The small excavator has been and gone (what a wonderful little machine it is) leaving a trail of half finished projects in its wake. The pad for the laundry/ bath house is dug out, levelled and a swale dug up hill to slow water flow down the slope and under the building. We also dug a spare toilet pit (for possible future use) and made a tank pad near the house for the 5000 gallon tank, then moved the big tank into place.
That has left me with piles of soil all over the place, some of which will be used to mix with cement and fill the foundation tires for the laundry. The best of that soil is destined to become the next section of my Hugelkultur beds and fill various planters around the place.

Rabbitto and a guinea fowl watch as the excavator digs the pad for the laundry

The laundry project has begun
The old tank on the humpy

Digging down so the bigger tank will fit under the gutter

The big tank which fits perfectly, but does dominate the front yard. Yes it oes tilt slightly down hill; the sand base sunk on that side.

Obviously part one of the laundry/ bath house project is not finished yet, but it has begun and I hope to have the foundations down by next weekend ('hope to' doesn't always equal'will' though). What an exciting time I am having at the moment.